Energy flows right.People live free.The world runs better.

We are the energy dispatchers for energy sites.

Why we started

Taiwan is an island with limited energy of its own. Every kilowatt-hour matters. At the same time, a low birth rate means fewer hands to keep every site running. In 2022, as electric buses and fleets began to scale, we saw energy sites running into the same walls: tight grid capacity, rising electricity costs, and charging decisions still made by hand. We believed energy should never be wasted, and neither should people's time.

Limited energy

An island that imports most of its energy.

Fewer hands

A shrinking workforce means every site must do more with fewer people.

Power limits
Charging schedules
Battery levels
Departure times
Electricity prices
Contract capacity
Charger status
Power demand

Why "Cubica"

Our name comes from the Rubik's Cube. To us, energy is never still. Power limits, charging schedules, battery levels, departure times, electricity prices, contract capacity: every piece is connected, and turning one changes all the others. Our work is to see the whole cube and turn every piece into place.

“We believe no one should have to struggle with energy.”

Behind every energy site, there are people watching power meters, worrying about next month's bill, and carrying thousands of decisions every single day. We saw that struggle, and we built Cubica to take it on. Our agent carries the weight around the clock, so people are free to do what only people can do.

Our journey

Cubica Power is developed by Comhawk, founded in 2014. Over a decade of turning data into decisions.

Comhawk · Data era
2014
Comhawk founded
2014–16
Real-time data analysis in Macau
2016
Big data team established
2020
IoT R&D team: connecting data to machines
Cubica Power · Energy era
2022
EV charging R&D begins: new controller boards and connectivity developed with charger manufacturers
2024
On-premise EMS launched for residential and commercial sites
2025
Cloud EMS launched for high-utilization, multi-site operations
2026
Level 3 cloud EMS launched for next-generation electric bus depots

Let's put your energy in place.

Contact Us