2026 MOT Subsidy Program

NT$1M Government Subsidy per Station for Smart Bus Charging

The Ministry of Transportation subsidizes smart charging systems for electric bus depots. Cubica Power covers key system requirements from basic monitoring to AI-powered scheduling.

50%
Contract Capacity Reduction
20%
Battery Life Extension
30%
Labor Reduction
20%
Operating Cost Reduction

Source: MOT projected benefits for smart charging deployment

What the Subsidy Covers

The Ministry of Transportation's 2026 subsidy program supports electric bus operators in deploying smart charging management systems. Projects that integrate vehicle, fleet, and charging data management are eligible for substantial government funding.

  • NT$1M per station
  • Government covers up to 49% of project costs
  • Eligible: city/highway bus operators, station operators, local governments
  • System must integrate vehicle, fleet, and charging data

Subject to MOT terms and conditions. Subsidy amounts may vary by project scope and eligibility.

Subsidy Snapshot

NT$1M
per station
49%
government-funded

Station Eligibility Requirements

  • Chargers must support OCPP 1.6 or later
  • At least 6 chargers installed per station
  • Every charger must output at least 100 kW
  • Each station can apply only once

Subject to MOT terms and conditions. Subsidy amounts may vary by project scope and eligibility.

System Requirement Levels

The MOT defines 3 levels of smart charging system capabilities. Cubica Power covers capabilities across all three levels.

Level 1
Basic Monitoring
Level 2
Load Management
Level 3
Smart Scheduling
Cubica Power
Charger monitoring
Charging status & SOC
Basic charger control
Multi-vehicle scheduling
Power load balancing
Contract capacity control
AI charging scheduling
Real-time analytics
Cubica Power — comprehensive smart charging for electric bus depots

How Cubica Power Delivers Each Level

FREE

Level 1: EV Management System

Covers all basic monitoring requirements. Dashboard, SOC tracking, and remote charger control included.

Learn More →
Add-on

Level 2: Smart Charging Agent

Adds multi-vehicle scheduling, power load balancing, and contract capacity optimization.

Learn More →
Full Solution

Level 3: Complete Solution

Everything in L1+L2 plus AI-powered scheduling and real-time analytics. Contact us for custom integration.

Contact Us →

Built for Bus Depot Operations

Bus depot charging bay overview dashboardBus depot charging bay overview dashboard

Depot Overview

Monitor all charging bays at your bus depot from a single dashboard. See real-time status of every charger, vehicle SOC, and bay availability at a glance.

Smart Load Balancing

Automatically balance power across chargers to stay within contract capacity. Prevent demand spikes and reduce electricity costs without manual intervention.

Smart charging load balancing monitorSmart charging load balancing monitor
Power limit scheduling interfacePower limit scheduling interface

Departure-Ready Scheduling

Align overnight charging with morning departure schedules. Every bus is charged to the required SOC before its first route, optimizing energy costs along the way.

From Consultation to Subsidy Claim

1

Consult

Free assessment of your depot. We recommend the right system configuration and estimate your subsidy eligibility.

2

Deploy

System setup, charger integration, and fleet schedule configuration. Your smart charging system is ready in days, not months.

3

Claim

We provide technical documentation and support for your MOT subsidy application. Maximize your funding with our guidance.

Why Cubica Power

  • Covers key MOT requirements across all three levels
  • Management system is completely free
  • OCPP compatible — works with any charger brand
  • Taiwan-based team, local support in Chinese
  • Flexible — from single depot to multi-site fleet
  • Custom integration available upon request

Seize the Subsidy, Upgrade to Smart Charging

Contact us for a free consultation. We'll assess your eligibility and plan your deployment.